架构评估是风险识别
评估判断架构是否适合预定目的,主要产出是潜在风险,而不是替团队修复设计。风险由发生概率与后果共同决定,评估投入应低于其降低风险的价值;安全关键或投入巨大的系统通常需要更多证据,熟悉领域的成熟方案则可能较少。识别后由设计者与项目管理者决定修复或显式接受,不能把列出问题当作风险已消除。
这张卡片看不懂?
这张卡片已通过人工审查,不再接受失败反馈。
已有反馈 · 0 条
还没有人提交反馈。
在整书笔记中的位置
原书出处 · 1 处
- 评估架构 · 查看原书依据
The output of an architecture evaluation includes an identification of risky portions of the architecture. A risk is an event that has both an impact and a probability. The estimated cost of a risk is the probability of that event occurring multiplied by the cost of the impact.
参考来源
- 位置:《Software Architecture in Practice, 4th Edition》第21章《评估架构》(来源项目:book-sources;源文件:extracted/Software Architecture in Practice, 4th Edition/_epub-src/ch21.html)
- 结论依据:原文解释评估判断架构是否适合预定目的,主要产出是潜在风险,而不是替团队修复设计;本章后续机制、例子与条件共同限定本卡,原书经验数字和前景不视为当前实测或现状。
- 原始内容:The output of an architecture evaluation includes an identification of risky portions of the architecture. A risk is an event that has both an impact and a probability. The estimated cost of a risk is the probability of that event occurring multiplied by the cost of the impact.